The manufacturer's promise, in its service contract, that turbines will run 95 to 97% of the time or of the possible energy, with payments below that. It overlaps with insured business interruption.

Definition

June 2023: Siemens Energy withdraws its guidance after finding failure rates higher than expected on onshore turbine components at its Siemens Gamesa subsidiary, and the stock loses more than a third in a single session. What the market read that day was the cost of guarantees: warranty replacements, and availability payments owed to operators over years of service contracts. The availability guarantee is the commercial centerpiece of the long-term service contract (full service agreement) signed with the manufacturer for ten, fifteen years or more. The manufacturer promises a rate, usually between 95 and 97%, nearer the top onshore, lower offshore where access depends on wave height. It is measured in time (hours the turbine is available over the hours in the period) or in energy (actual output over possible output at measured wind). The IEC 61400-26-1 standard, in its 2019 edition, sets the categories used to count, and the contract says which are excluded: grid curtailment, force majeure, wind out of range, often externally caused losses. Below the threshold, the manufacturer pays an amount based on lost energy, usually capped at a fraction or all of the annual service fee. Availability above a second threshold sometimes earns a bonus. The interplay with insurance plays out on machinery breakdown. A gearbox failure triggers the physical damage policy and, after the deductible in days, business interruption; the same downtime lowers availability and can trigger the manufacturer's payment. The policy often provides for crediting sums received under the guarantee, or reserves recourse against the manufacturer. On a serial defect, the contractual guarantee carries most of the weight, and the underwriter checks the cap on availability payments before pricing BI.

Its 7 cross-references, woven across the glossary's 18 categories
Turbine availability guarantee: Infrastructure & data centers glossary illustration, AlgoPolis
Example

Textbook case, in numbers. A farm of 50 turbines of 6 MW (300 MW) at a 35% capacity factor produces 300 × 8,760 × 0.35 = 919,800 MWh a year. Guaranteed availability: 97%; achieved: 94%. The 3 missing points are worth 27,594 MWh, at 80 euros/MWh: the manufacturer pays 2,207,520 euros. One turbine, with a broken gearbox, was down 150 days: 6 × 24 × 150 × 0.35 = 7,560 MWh, or 604,800 euros. BI deductible of 60 days: 90/150 × 604,800 = 362,880 euros. If the policy credits 300,000 euros of availability payments allocated to that turbine, it pays 62,880 euros.

Read next
Sources
Related terms
Also known as

availability guarantee, guaranteed availability, availability warranty, availability LDs

Stay informed

Follow the research

One letter a week. First, the week's underwriting note, when one is published: a dated, argued decision, signed by Paul Bernardski. Then what the observatory published on cyber risk, political risk and insurance. No account, no tracking.

No spam, one-click unsubscribe, no data ever sold.