Maximum foreseeable loss (MFL)
The largest loss a fire or explosion can cause at a site when every active protection is out of service and only fire walls and open space stop the fire. It caps the PML from above.
On September 26, 2019, in Rouen, the fire that hit Lubrizol and its neighbor Normandie Logistique burned close to 9,500 metric tons of product. Faced with a site like that, a loss prevention engineer asks how far the fire will go if the sprinklers do not work, and the answer is the maximum foreseeable loss (MFL).
The MFL assumes every active protection fails, sprinklers, detection and a quick fire department response. Only passive barriers hold, a fire wall built to stay standing when everything burns on one side, or enough open space between two buildings. FM Global sets out the method in its loss prevention data sheet 1-22, and NFPA 221 describes the walls that can bound the loss. With no barrier, the MFL runs until the fuel is gone, often the full value of the site.
Engineering practice puts three figures on the same risk. Normal loss expectancy (NLE) assumes every protection works. The PML assumes the main protection is impaired, nearly always the sprinklers, and the rest in order. The MFL keeps only the passive features. So NLE ≤ PML ≤ MFL ≤ total insured value, by construction.
European markets prefer EML, a figure each carrier places somewhere between the US PML and MFL, in its own way, which is where the misunderstandings start. A fire wall pierced by a door with no automatic closer, or crossed by a conveyor, does not bound an MFL, and the engineer who spots it on the survey merges the two areas. Business interruption is estimated separately, on the same scenario, and it is often the bigger number.
A made-up case. A logistics site with €300 million of total insured value, surveyed in March 2026, has three areas split by fire walls, A at €150 million, B at €90 million and C at €60 million. With the sprinklers working, the engineer sets the NLE at €12 million, 4% of the site. With the sprinklers out in area A and the fire department on hand, the PML is 60% of the area, 0.6 × 150 = €90 million. The MFL assumes area A is lost entirely, €150 million, half the site, provided the wall between A and B holds. On the survey, that wall turns out to be crossed by a conveyor belt with no fire-rated closure, and the MFL rises to 150 + 90 = €240 million, 80% of the site.
- FM Global, Property Loss Prevention Data Sheet 1-22, Maximum Foreseeable Loss
- NFPA 221, Standard for High Challenge Fire Walls, Fire Walls, and Fire Barrier Walls (National Fire Protection Association)
MFL, maximum foreseeable loss, MFL vs PML, normal loss expectancy, NLE, MFL fire wall