The triangle
Cumulative paid claims in thousands of euros, by accident year and development year. The triangle is made up for the exercise. The bottom diagonal is the position at 31 December 2025.
AY 1 2 3 4 5 21 1,000 1,800 2,160 2,376 2,424 22 1,100 2,035 2,400 2,652 23 1,200 2,100 2,550 24 1,300 2,470 25 1,400
- AY
- 1
- 2
- 3
- 4
- 5
- 21
- 1,000
- 1,800
- 2,160
- 2,376
- 2,424
- 22
- 1,100
- 2,035
- 2,400
- 2,652
- 23
- 1,200
- 2,100
- 2,550
- 24
- 1,300
- 2,470
- 25
- 1,400
The development factors
The factor from age k to age k+1 is computed column against column, using only the years that have both values: sum, then divide, which weights each year by its volume. A simple average of the individual ratios gives a different number, and a marker will count it wrong.
From 1 to 2, four years: numerator 1,800 + 2,035 + 2,100 + 2,470 = 8,405, denominator 1,000 + 1,100 + 1,200 + 1,300 = 4,600, factor 8,405 / 4,600 = 1.827. From 2 to 3, three years: 7,110 / 5,935 = 1.198. From 3 to 4: 5,028 / 4,560 = 1.103. From 4 to 5 only 2021 is left: 2,424 / 2,376 = 1.020.
The cumulative factor at a given age is the product of the factors still to run to ultimate. At age 4: 1.020. At age 3: 1.103 × 1.020 = 1.125. At age 2: 1.198 × 1.125 = 1.348. At age 1: 1.827 × 1.348 = 2.462. No tail: everything is paid by age 5.
step num. den. f cum. 1-2 8,405 4,600 1.827 2.462 2-3 7,110 5,935 1.198 1.348 3-4 5,028 4,560 1.103 1.125 4-5 2,424 2,376 1.020 1.020
Projecting to ultimate
Fill in the lower triangle by multiplying the latest known value by the next age's factor. For 2025: 1,400 × 1.827 = 2,558, then × 1.198 = 3,064, × 1.103 = 3,379, × 1.020 = 3,447. The shortcut gives the same answer: 1,400 × 2.462 = 3,447.
AY 2 3 4 5 22 2,706 23 2,812 2,869 24 2,959 3,263 3,329 25 2,558 3,064 3,379 3,447
- AY
- 2
- 3
- 4
- 5
- 22
- 2,706
- 23
- 2,812
- 2,869
- 24
- 2,959
- 3,263
- 3,329
- 25
- 2,558
- 3,064
- 3,379
- 3,447
Reserve by year and in total
The reserve is the ultimate less paid to date. For 2024: 3,329 − 2,470 = 859. For 2025: 3,447 − 1,400 = 2,047. 2021 has reached age 5 and has nothing left to pay.
AY paid ultimate reserve 21 2,424 2,424 0 22 2,652 2,706 54 23 2,550 2,869 319 24 2,470 3,329 859 25 1,400 3,447 2,047 tot 11,496 14,774 3,278
- AY
- paid ultimate
- reserve
- 21
- 2,424
- 2,424
- 0
- 22
- 2,652
- 2,706
- 54
- 23
- 2,550
- 2,869
- 319
- 24
- 2,470
- 3,329
- 859
- 25
- 1,400
- 3,447
- 2,047
- tot 11,496
- 14,774
- 3,278
Total: 14,774 − 11,496 = 3,278 k€. The reserves rounded one by one add up to 3,279; the full-precision total, 3,277.9, gives 3,278, and that is the figure to write.
What the method assumes
Chain ladder holds if the accident years are homogeneous (same book, same settlement practice) and if the payment pattern is stable from one year to the next. Faster settlement or one large loss in a single year is enough to break either, and the triangle will not flag it.
Where it breaks: the latest year
2025 has a single observed point, 1,400, and everything else comes from the factors: 1,400 × 2.462 = 3,447, of which 59% is still to be paid. The first factor does most of the work. The individual 1-to-2 ratios run from 1.750 (2023: 2,100 / 1,200) to 1.900 (2024: 2,470 / 1,300). If 2025 develops like 2023, the ultimate is 1,400 × 1.750 × 1.348 = 3,302 and the reserve 1,902. Like 2024, 1,400 × 1.900 × 1.348 = 3,585 and the reserve 2,185. Ten hundredths on the first factor move the reserve by 1,400 × 0.1 × 1.348 = 189 k€, on a year that already holds 62% of the total (2,047 / 3,278).
That is why Bornhuetter-Ferguson replaces this single point with an a priori loss, and why the Mack method puts a standard error on the same reserve from the same triangle (Mack, ASTIN Bulletin, 1993). The share that belongs to claims not yet reported is on the page IBNR: estimating it from a triangle. The Academy quiz works through the same reasoning: estimating what a year of claims will cost.