What Mack adds to the chain ladder
The chain ladder gives one number, the reserve, and says nothing about how precise it is. In 1993 Thomas Mack showed that a mean squared error of prediction can be attached to it without assuming any distribution for the payments (Mack, ASTIN Bulletin, 1993). Three assumptions do the work: the expected next cumulative payment is the factor times the current one, its variance is proportional to the current cumulative (the coefficient is σ²ₖ), and accident years are independent.
The triangle is made up for this series of exercises; no figure comes from a real portfolio. Cumulative paid, €k:
yr 1 2 3 4 5 21 1,000 1,800 2,160 2,376 2,424 22 1,100 2,035 2,400 2,652 23 1,200 2,100 2,550 24 1,300 2,470 25 1,400
- yr
- 1
- 2
- 3
- 4
- 5
- 21
- 1,000
- 1,800
- 2,160
- 2,376
- 2,424
- 22
- 1,100
- 2,035
- 2,400
- 2,652
- 23
- 1,200
- 2,100
- 2,550
- 24
- 1,300
- 2,470
- 25
- 1,400
The factors and the €3,278k reserve are set out in the chain ladder worked example.
The σ²ₖ, one per development step
For the step from age 1 to age 2, four years are observed. The factor is 8,405 / 4,600 = 1.827 (column 2 total over column 1 total, years 2021 to 2024). Each year has its own link ratio, and its distance from the factor is weighted by its starting volume:
yr C₁ C₂/C₁ term 21 1,000 1.80 0.738 22 1,100 1.85 0.573 23 1,200 1.75 7.147 24 1,300 1.90 6.895
- yr
- C₁
- C₂/C₁
- term
- 21
- 1,000
- 1.80
- 0.738
- 22
- 1,100
- 1.85
- 0.573
- 23
- 1,200
- 1.75
- 7.147
- 24
- 1,300
- 1.90
- 6.895
The first term reads 1,000 × (1.80 - 1.827)² = 0.738, with the factor taken at full precision. The terms add up to 15.353; divide by the number of years minus one, 3, and σ²₁ = 5.118. Years 2023 and 2024 do most of it: their link ratios are the two furthest from the factor.
Steps 2 and 3 work the same way, on three and then two years. The last step has a single observation, 2021, and the formula would divide by zero. Mack extrapolates: σ²₄ = min(σ⁴₃ / σ²₂ ; σ²₂ ; σ²₃), that is min(0.028² / 0.636 ; 0.636 ; 0.028) = 0.001.
k factor σ²ₖ 1 1.827 5.118 2 1.198 0.636 3 1.103 0.028 4 1.020 0.001
- k
- factor
- σ²ₖ
- 1
- 1.827
- 5.118
- 2
- 1.198
- 0.636
- 3
- 1.103
- 0.028
- 4
- 1.020
- 0.001
The error for one accident year
For year i, with Ĉᵢ the estimated ultimate, Ĉᵢ,ₖ the cumulative (observed or projected) at age k, and Sₖ the column k total over the years that observed the step:
mse(Rᵢ) = Ĉᵢ² × Σₖ (σ²ₖ / fₖ²) × (1 / Ĉᵢ,ₖ + 1 / Sₖ), summed over the steps still to come.
The 1 / Ĉᵢ,ₖ part is process variance on future payments; the 1 / Sₖ part is the estimation error in the factor. For 2025, the first step weighs 5.118 / 1.827² = 1.533, times (1 / 1,400 + 1 / 4,600), giving 0.00143. The four steps add to 0.00169, of which 84.5% comes from the first. Times the squared ultimate, 3,447², that is 20,078 at full precision, and the standard error is √20,078 = 142.
yr reserve s.e. in % 21 0 0 - 22 54 3 5.0% 23 319 11 3.5% 24 859 54 6.3% 25 2,047 142 6.9% all 3,278 159 4.8%
- yr
- reserve
- s.e.
- in %
- 21
- 0
- 0
- -
- 22
- 54
- 3
- 5.0%
- 23
- 319
- 11
- 3.5%
- 24
- 859
- 54
- 6.3%
- 25
- 2,047
- 142
- 6.9%
- all
- 3,278
- 159
- 4.8%
Why the total is less than the sum
Adding up the standard errors gives 0 + 3 + 11 + 54 + 142 = €210k, or 6.4% of the reserve. That would hold if every year went wrong together and in the same direction. They do not: process variance is independent from one year to the next, and variances add. The five mse values total 23,178, whose square root is €152k.
One term remains. Two years projected with the same estimated factors share the same estimation error: if f₁ is too high, 2024 and 2025 are both overstated. For each pair of years Mack adds 2 × Ĉᵢ × Ĉⱼ × Σₖ (σ²ₖ / fₖ²) / Sₖ, over the steps they have in common. Here it comes to 2,088. The total becomes 23,178 + 2,088 = 25,266, and √25,266 = €159k.
What to keep in mind
A triangle this regular gives a small error, and 4.8% tells you nothing about a real book. With five years, σ²₁ rests on four link ratios, σ²₃ on two, σ²₄ on none: these are very shaky estimates, and one odd ratio can double them. A marker will expect the answer to say so.
The other two exercises in the series use the same triangle: the IBNR estimate from a triangle and the Bornhuetter-Ferguson versus chain ladder comparison. To practise, the Academy quiz: estimating what a year of claims will cost.