Skip to content

Intentional ignition

The moment launch cover takes over from pre-launch cover, the deliberate ignition of the engines with intent to lift off, which most launch services agreements also treat as the point the service is delivered.

Definition

On September 1, 2016, the Falcon 9 that was to carry Amos-6 exploded on Space Launch Complex 40 at Cape Canaveral during propellant loading ahead of a static fire test. No engine had been lit with intent to launch, and the operator's launch policy had not attached. The market puts that point at intentional ignition of the first-stage engines, or of the strap-on boosters where the vehicle has them, with intent to lift off. Before it, the spacecraft sits under pre-launch cover, often the manufacturer's; after it, under the launch plus one year policy. Launch services agreements often pick the same instant as the point the service is deemed performed, which lines up the transfer of risk with the end of the launch provider's obligations.

The drafting fight is over the edge case, ignition followed by a shutdown before liftoff. The shuttle Discovery went through it on June 26, 1984, during the countdown for mission STS-41-D, main engines shut down seconds before launch with three communications satellites in the payload bay. Depending on the wording, such an abort suspends the launch policy and hands the spacecraft back to pre-launch cover, or leaves the premium earned and the launch cover open until the next attempt. A static fire with the payload mated, which SpaceX was preparing on the day of Amos-6, lights the engines with no intent to lift off and falls between the two definitions unless a policy names it.

Example

A hypothetical example, as of June 9, 2025. The Tessel-2 satellite is insured on a launch plus one year basis for €280 million at a 7% rate, a premium of 0.07 × 280 = €19.6 million. The policy says cover attaches at intentional ignition and that a shutdown before liftoff suspends it, with pre-launch cover picking the spacecraft back up. The engines light, the flight computer shuts them down three seconds later and the vehicle stays on the pad. Inspection puts the rework on equipment shaken by the abort at €12 million. The pre-launch policy, with a €1.5 million deductible, pays 12 − 1.5 = €10.5 million, and the €19.6 million launch premium carries over to the next attempt.

Read next
Sources
  • Commercial Space Launch Act, 51 U.S.C. chapter 509, section 50914 (insurance and reciprocal waiver)
  • French Space Operations Act, Law No. 2008-518 of June 3, 2008, Article 1 (definition of the launch phase)
  • F. Lyall and P. B. Larsen, Space Law, A Treatise, Ashgate, Farnham, 2009, chapter on space insurance
Related terms
Also known as

intentional ignition, launch risk attachment, attachment of launch cover

Stay informed

Follow the research

One letter a week. First, the week's underwriting note when one is published, with its dated, reasoned decision. Then what the observatory published on cyber, artificial intelligence, insurance and reinsurance. No account, no tracking.

No spam, one-click unsubscribe, no data ever sold.