In-orbit testing and acceptance
The test campaign following orbit raising through which the customer accepts the satellite, the contractual hinge where launch cover gives way to in-orbit cover.
In-orbit testing is the campaign run after orbit raising. Every subsystem (propulsion, power, attitude control, payload) is verified under real conditions before the customer formally accepts the satellite. It serves two functions that have nothing to do with each other and must be kept apart. Technically, it exposes the design and integration faults that only appear in flight, the period that carries by far the highest loss frequency of the whole spacecraft life. Contractually, it is the hinge that transfers title and risk from manufacturer to operator. It is also where cover moves from the launch policy, often written as launch plus twelve months, to the annually renewed in-orbit policy. An anomaly found during acceptance therefore raises the most litigated question in the class, the date of occurrence: the answer determines which insurer responds, which deductible applies and whether a manufacturer warranty claim exists at all.
The Inmarsat-6 F2 satellite, launched in February 2023, suffered a power subsystem failure during orbit raising, disclosed in September 2023, before entering operational service.
in-orbit testing, IOT, in-orbit acceptance
Follow the research
One letter a week. First, the week's underwriting note, when one is published: a dated, argued decision, signed by Paul Bernardski. Then what the observatory published on cyber risk, political risk and insurance. No account, no tracking.
No spam, one-click unsubscribe, no data ever sold.