Book No. 23 as text
The owner's building damage insurer pays for the crack first and looks for who is liable later
A crack shows up eight years after a house was accepted from the builder. What does the ten-year liability owe, what does the dommages-ouvrage policy owe, and who fronts the money?
Written for: A construction claims handler, a broker placing a dommages-ouvrage policy for a project owner, an in-house lawyer who receives a claim eight years after acceptance of the works and has sixty days to say who pays for what.
The case
On June 15, 2018, a single-story house in Touraine is accepted from the builder, the acceptance report signed with no reservations. The example is a textbook one, with dates and amounts chosen so the arithmetic comes out clean. The owners bought a dommages-ouvrage policy, the owner's own building damage cover, in March 2017, before work started on site in April, as Article L. 242-1 of the French Insurance Code requires. The structural contractor and the structural design office, each carrying ten-year liability cover as Article L. 241-1 demands, did their share of the job. In June 2026, eight years after acceptance, a stepped crack runs right through the north gable wall and rain gets in behind the lining. The claim reaches the dommages-ouvrage insurer on July 3, 2026. The adjuster puts the crack down to foundations too shallow for clay soil and prices the underpinning at €84,000 including VAT. The framework is Law No. 78-12 of January 4, 1978, known as the Spinetta law, which rewrote Article 1792 of the Civil Code and made insurance compulsory on both sides of the site.
Sources · Code civil art. 1792 à 1792-2 (rédaction issue de la loi de 1978) · Code des assurances art. L. 241-1 (assurance de responsabilité décennale de 1978) · Code des assurances art. L. 242-1 (assurance dommages-ouvrage de 1978) · Loi n° 78-12 du 4 janvier 1978 relative à la responsabilité et à l'assurance dans le domaine de la construction
Spread 1Eight years after acceptance, the crack is judged by how serious it is
Article 1792 of the Civil Code makes every builder liable as of right, to the owner or buyer of the works, for damage that compromises their structural soundness or that, affecting one of their component parts or fixtures, makes them unfit for their intended use, even where the damage comes from a defect in the ground. As of right means with no fault to prove; the builder escapes only by showing an external cause. Article 1792-1 counts as builders the architect, contractor and engineer bound to the owner by a works contract, the seller of a building it built or had built, and the agent who performs a comparable task. The house's design office is one of them, and so is the structural contractor. The clay soil in Touraine changes nothing, since the article holds builders liable even where the damage comes from a defect in the ground. Under Article 1792-2 the presumption also reaches damage to the soundness of fixtures that form an inseparable whole with the site services, foundations, frame, enclosure or roof, the ones that cannot come out without damaging the building.
Everything starts from acceptance of the works, which Article 1792-6 defines as the act by which the owner declares that it accepts them, with or without reservations. Three periods run from it. One year of the completion guarantee, owed by the contractor for defects noted in the acceptance report or notified during the year. At least two years of the proper-working guarantee for fixtures that can be removed without damaging the structure, under Article 1792-3. And ten years, under Article 1792-4-1, for liability under Articles 1792 to 1792-2. A roller shutter that jams in 2026 has been out of time since 2020; the gable crack, the same year, stays inside its period until 2028. A reservation written into the acceptance report ties the defect it names to the completion guarantee, and the contractor puts it right within the year. The dommages-ouvrage policy takes effect, in principle, only when that first year is over; before then it responds only if the contractor, put on formal notice, fails to perform.
The width of the crack settles nothing. Crazing in the render, however widespread, remains cosmetic as long as it lets no water in and does not threaten the structure; it falls outside the ten-year liability and, where fault is proved, comes under the contractual liability the courts apply to this so-called intermediate damage, which Article 1792-4-3 also confines to ten years from acceptance. The through crack in the gable lets rain into a lived-in room, which is usually enough to make the house unfit for its use. The adjuster also checks whether it is getting worse, fitting crack monitors, reading the gap on fixed dates and comparing it with the photos sent in with the claim. A defect that does not reach ten-year seriousness before the ten years are out never comes within it.
Market term · Acceptance (réception). The act by which the owner accepts the works, with or without reservations (Article 1792-6). The completion guarantee, the proper-working guarantee and the ten-year liability all run from its date.
Sources · Code civil art. 1792 à 1792-2 (rédaction issue de la loi de 1978) · Code civil art. 1792-3 (rédaction issue de l'ordonnance n° 2005-658 du 8 juin 2005) · Code civil art. 1792-4-1 à 1792-4-3 (loi n° 2008-561 du 17 juin 2008) · Code civil art. 1792-6 (réception et parfait achèvement de 1978) · Code des assurances art. L. 242-1 (assurance dommages-ouvrage de 1978)
Spread 2Sixty days to say yes, ninety to put a figure on it
Dommages-ouvrage insurance pays, without anyone first being found liable, for all the repair work on damage of the kind builders answer for under Article 1792. Article L. 242-1 makes it compulsory for anyone who has construction work done as owner, seller or the owner's agent, before work starts on site, on their own behalf or on behalf of later owners. Public-law bodies are exempt, as are some large companies building for a use other than housing. A private individual building a house is bound by it; Article L. 243-3 spares them only the criminal penalty when they build to live there or to house close family. The words "on their own behalf or on behalf of later owners" tie the policy to the building. Had the Touraine house been sold in 2024, the buyers would have notified the crack in 2026, under the policy the sellers took out in March 2017.
The text holds the insurer to two deadlines, both running from receipt of the claim notice. Sixty days to notify its decision on whether the cover is triggered in principle. Ninety days to present an offer of indemnity, provisional where need be, meant to pay for the repair work. An insured who accepts the offer is paid within fifteen days. Where the nature or size of the loss raises exceptional difficulties, the insurer may propose, together with its agreement in principle, an extra period based on technical grounds and reasoned, which the insured must expressly accept and which cannot exceed one hundred thirty-five days. The procedure follows the model clauses in Annex II to Article A. 243-1. The insurer appoints the adjuster, and its decision in principle rests on the preliminary report the adjuster draws up and the insured receives. The one hundred thirty-five days can never be forced on the owners. Without their express consent, the offer is still due on day ninety.
The penalty sits in the same article. If the insurer misses either deadline, or puts forward an offer that is plainly inadequate, the insured may, after notifying the insurer, commit the spending needed for the repairs, and the indemnity is increased as of right by interest at twice the statutory interest rate. The courts also draw from this that an insurer silent on day sixty can no longer dispute its cover in principle; this book cites no ruling on the point and its exact reach is still to be read. The statutory interest rate is set every six months by ministerial order (Article L. 313-2 of the Monetary and Financial Code), and the exercise takes it as an assumption. On €84,000, at twice a rate assumed at 4%, so 8% a year, every month of delay costs the insurer €560.
Market term · Prefunding. What the market calls the dommages-ouvrage payment made before anyone's liability is decided. The insurer pays for the repair, then turns to the builders and their insurers.
Sources · Code des assurances art. L. 242-1 (assurance dommages-ouvrage de 1978) · Code des assurances art. A. 243-1 et ses annexes I et II (clauses types) · Code monétaire et financier art. L. 313-2 (taux de l'intérêt légal) · Code des assurances art. L. 243-3 (sanction pénale du défaut d'assurance)
Spread 3Without dommages-ouvrage cover, the owners wait for the end of the lawsuit
With a dommages-ouvrage policy, the route is short. The owners notify, the insurer appoints an adjuster, takes a position and pays, without waiting for anyone to be found liable. In the example the money arrives by October 16, 2026 at the latest, one hundred five days after the claim, provided the owners accept the offer the day it comes in; and the underpinning can be ordered before winter. Liability is sorted out afterward between insurers, without the owners. The fifteen days for payment run from acceptance. Owners who take ten days to read the October 1 offer accept it on the 11th and are paid by October 26 at the latest.
Without dommages-ouvrage cover, the owners have to go after the builders themselves. The usual route runs through a court-appointed expert requested in summary proceedings (Article 145 of the Code of Civil Procedure), then a claim on the merits against the contractor, the design office and their ten-year liability insurers, whom Article L. 124-3 of the Insurance Code allows them to sue directly. The work usually waits for the expert's report, because repairing first means removing what the expert needs to see. The book gives no average length for these proceedings, for want of a published figure it could read; the exercise lets the reader set their own. Summary proceedings under Article 145 need a legitimate reason to secure evidence before any trial, and a crack that lets in the rain supplies one easily.
The hardest case is the contractor that went into liquidation with no ten-year liability cover, despite the obligation in Article L. 241-1. Without dommages-ouvrage cover there is nothing to recover on that side, and the owners are left with the other builders, provided they are found liable. With a dommages-ouvrage policy, the insurer pays within its deadlines all the same, and it is the one left carrying the share of the recovery that will never come in. A liquidated contractor that was insured still leaves something to grab. The direct action under Article L. 124-3 goes straight to its ten-year liability insurer, the one covering it when the site opened in April 2017, without going through the liquidator.
The lane without dommages-ouvrage cover costs money before it brings any in. The judge who orders the expert's report sets a deposit for the expert's fees, usually paid by the party asking for it, and the lawyer's fees follow. The crack stays open all the while. The gable gets a tarpaulin, crack monitors go on, every reading is dated, because the expert will want to know whether it has moved. On paper, the repair is still worth €84,000; inside the house, the gable room spends another winter with water behind the lining. When the court expert finally reports, the owners still hold only a technical opinion. The judgment on the merits comes later, and after it, enforcement against the ten-year liability insurers.
Market term · Direct action. The right, given to the injured third party by Article L. 124-3, to sue the liable party's insurer without going through the insured. It is what the owners have left when the contractor is liquidated but was insured.
Sources · Code des assurances art. L. 241-1 (assurance de responsabilité décennale de 1978) · Code des assurances art. L. 242-1 (assurance dommages-ouvrage de 1978) · Code des assurances art. L. 124-3 (action directe du tiers lésé) · Code de procédure civile art. 145 (mesure d'instruction avant tout procès)
Spread 4The insurer that prefunded works its way back up the chain of builders
Having paid €84,000, the dommages-ouvrage insurer is subrogated, up to the amount of the indemnity, to the owners' rights against those liable (Article L. 121-12 of the Insurance Code). It sues the structural contractor, the design office and their ten-year liability insurers, with the rights the owners would have had, no more and no less. It also inherits their deadline, since the recovery rests on the builders' liability. In the example, the tenth anniversary of acceptance falls on June 15, 2028. Had the insurer paid only €60,000, with the owners funding the rest, it could claim back only €60,000, and the remaining €24,000 would stay a claim for the owners to bring.
Each builder's liability insurance has been compulsory since the 1978 law. Article L. 241-1 requires builders to show, when any site opens, a policy covering them for that liability, and deems the policy to keep the cover in place for the entire ten-year liability period. The policy that responds is the one that covered the builder when the site opened, even if it has since been canceled. The contractor may have switched insurers three times or stopped trading; the insurer from April 2017 is still on the hook until 2028. The model clauses in Annex I to Article A. 243-1 say the same thing from the policy side, since the cover there applies to sites opened while it is in force. The recovery handler therefore asks for the certificate of insurance valid in April 2017.
When two builders contributed to the same damage, the court usually holds them liable in solidum. Each answers for the whole toward the victim, and so toward the subrogated insurer, and the burden is then split between them according to their fault, as the expert proposes and the court decides. If the expert puts 70% on the structural contractor and 30% on the design office, the final burden splits into €58,800 and €25,200, and the design office's insurer ends up keeping €25,200. The dommages-ouvrage insurer can claim the full €84,000 from the design office's insurer alone, which then turns to the structural contractor's insurer for €58,800. If the structural contractor has vanished uninsured, it keeps the full €84,000, because its own claim against the contractor brings in nothing.
Market term · Subrogation. The insurer that has paid steps into the insured's shoes against those liable, up to what it paid (Article L. 121-12).
Sources · Code des assurances art. L. 241-1 (assurance de responsabilité décennale de 1978) · Code des assurances art. A. 243-1 et ses annexes I et II (clauses types) · Code des assurances art. L. 121-12 (subrogation de l'assureur)
Spread 5Everything has to be filed before June 15, 2028
The ten-year period of Article 1792-4-1 discharges the builders on June 15, 2028, the tenth anniversary of acceptance. A claim notice to the dommages-ouvrage insurer does not stop that clock as against the builders; only court proceedings, summary proceedings included (Article 2241 of the Civil Code), or the builder's own acknowledgment of liability (Article 2240) stop it. The insurer that paid on October 16, 2026 therefore has 608 days to sue the contractor, the design office and their insurers. After that day its recovery runs into the deadline, whatever the amount it paid. From July 3, 2026, the day of the claim, to June 15, 2028, there are 713; the insurer takes 105 to handle the file and pay, which leaves it 608. An out-of-court survey taking eighteen months, opened the day after payment without suing anyone, would report around April 17, 2028, 59 days before the cutoff. So the claims handler does not wait for a report to act; it asks for the expert in summary proceedings, which stops the clock, and it names everyone, because as a rule the interruption counts only against the parties the writ names. A structural contractor left off the writ is out of the file on June 15, 2028, even if the expert finds against it. The court expert costs a deposit; leaving a builder off the writ costs its whole share, €58,800 if it is the structural contractor and the split puts 70% on it.
An acknowledgment is read from the documents. A contractor who comes back in August 2026 to fit crack monitors on the gable and writes that it will redo the foundations at its own cost has acknowledged liability; a visit with no commitment, or a repair offered as a goodwill gesture, is argued before the judge. The claims handler does not build a strategy on it. A letter is easier to dispute than a writ, and nothing says the builder's acknowledgment holds against its insurer, a point the book does not settle.
The owners have their own clock against the dommages-ouvrage insurer. Their claim arises from the insurance contract and is time-barred after two years (Article L. 114-1). Article L. 114-2 gives them two ways to interrupt those two years without going to court: the appointment of an expert after the loss, and a registered letter with acknowledgment of receipt sent to the insurer about settling the claim. When that period starts, for a construction defect, is a matter of case law the book does not settle. That clock would matter had the owners turned the offer down; a registered letter about the settlement, sent the day they refused, would then have restarted the two years. The damage must also have appeared within the ten years. A crack found in July 2028 comes too late for the dommages-ouvrage policy and the ten-year liability alike.
The 1978 law built this arrangement on two levels. The owner is paid quickly by its own insurer, then the builders' insurers settle among themselves what each fault is worth, each level with its statute, its date and its penalty. In the example, the owners have their money on October 16, 2026 without having had to prove who dug the foundations too shallow; the rest plays out between insurers, before June 2028.
Market term · Proving period. The name French legal writers give the ten years of Article 1792-4-1. The defect must appear and the claim be filed in court before it ends, and no notice to an insurer pushes that end back.
Sources · Code civil art. 1792-4-1 à 1792-4-3 (loi n° 2008-561 du 17 juin 2008) · Code des assurances art. L. 242-1 (assurance dommages-ouvrage de 1978) · Loi n° 78-12 du 4 janvier 1978 relative à la responsabilité et à l'assurance dans le domaine de la construction · Code civil art. 2241 (interruption par la demande en justice de 2008) · Code des assurances art. L. 114-1 (prescription biennale) · loi de 2008) · Code des assurances art. L. 114-2 (interruption de la prescription biennale)
Key points
- The ten-year liability (Articles 1792 to 1792-2 of the Civil Code) covers damage that compromises the soundness of the works or makes them unfit for their use, for ten years from acceptance (Article 1792-4-1).
- The completion guarantee lasts one year (Article 1792-6), the proper-working guarantee on removable fixtures at least two years (Article 1792-3); a purely cosmetic defect falls outside the ten-year liability.
- The dommages-ouvrage insurer has sixty days to take a position and ninety to make an offer, from receipt of the claim notice; if it misses them, the insured commits the work and the indemnity carries interest at twice the statutory rate (Article L. 242-1).
- Dommages-ouvrage cover prefunds without looking for fault; the insurer, subrogated (Article L. 121-12), then turns to the builders and their ten-year liability insurers, compulsory since Law No. 78-12 of January 4, 1978.
- Only court proceedings, summary proceedings included (Article 2241), or the builder's acknowledgment (Article 2240) stop the ten years; a claim notice to an insurer stops nothing as against the builders, and the insurer's recovery and the owners' claim alike must be filed before the tenth anniversary of acceptance.
Sources
- Code civil art. 1792 à 1792-2 (rédaction issue de la loi de 1978), 1978-01-04 · not yet checked at source
- Code civil art. 1792-3 (rédaction issue de l'ordonnance n° 2005-658 du 8 juin 2005), 2005-06-08 · not yet checked at source
- Code civil art. 1792-4-1 à 1792-4-3 (loi n° 2008-561 du 17 juin 2008), 2008-06-17 · not yet checked at source
- Code civil art. 1792-6 (réception et parfait achèvement de 1978), 1978-01-04 · not yet checked at source
- Code des assurances art. L. 241-1 (assurance de responsabilité décennale de 1978), 1978-01-04 · not yet checked at source
- Code des assurances art. L. 242-1 (assurance dommages-ouvrage de 1978), 1978-01-04 · not yet checked at source
- Code des assurances art. A. 243-1 et ses annexes I et II (clauses types) · not yet checked at source
- Loi n° 78-12 du 4 janvier 1978 relative à la responsabilité et à l'assurance dans le domaine de la construction, 1978-01-04 · not yet checked at source
- Code des assurances art. L. 121-12 (subrogation de l'assureur) · not yet checked at source
- Code des assurances art. L. 124-3 (action directe du tiers lésé) · not yet checked at source
- Code monétaire et financier art. L. 313-2 (taux de l'intérêt légal) · not yet checked at source
- Code des assurances art. L. 243-3 (sanction pénale du défaut d'assurance) · not yet checked at source
- Code de procédure civile art. 145 (mesure d'instruction avant tout procès) · not yet checked at source
- Code civil art. 2240 (interruption par la reconnaissance, loi de 2008), 2008-06-17 · not yet checked at source
- Code civil art. 2241 (interruption par la demande en justice de 2008), 2008-06-17 · not yet checked at source
- Code des assurances art. L. 114-1 (prescription biennale) · not yet checked at source
- Code des assurances art. L. 114-2 (interruption de la prescription biennale) · not yet checked at source
What we chose not to write
- None of this book's sources was read from the original while it was written. The articles of the Civil Code, the Insurance Code, the Code of Civil Procedure and the Monetary and Financial Code, like Law No. 78-12 of January 4, 1978, are cited from a practitioner's memory and are still to be read in their current version; every source is marked "to be verified."
- The rule that an insurer silent on day sixty can no longer dispute its cover in principle comes from case law, and the book cites no ruling on it. Its exact reach, in particular for a defect that would not be of a ten-year nature, is still to be read.
- Article L. 242-1 does not say from when the interest at twice the statutory rate runs. The example runs it for six months on the whole indemnity, as simple interest, as a textbook assumption; the 4% rate is assumed, not taken from any order.
- Deadlines are counted in calendar days from the day after the claim notice is received. The rule that pushes back a deadline falling on a Saturday, Sunday or public holiday is not examined, since none of the example's deadlines falls on one.
- Liability in solidum and the 70/30 split are an example. A court can also hold each builder liable for its own share only where the damage can be separated, and the limits in liability policies are not examined.
- When the two-year time bar against the dommages-ouvrage insurer starts, and what a claim notice does to it, are debated in case law; the book gives only the principle.
- The line between cosmetic damage and unfitness for use, like the line between removable and non-removable fixtures, is drawn case by case. The three defects in the first exercise are typical examples, not decided cases.
- The nickname Spinetta law, in common use, comes from the engineer who chaired the preparatory commission; the law's entry into force, often given as January 1, 1979, is not stated in the book, since it was not read from the original.
- The acknowledgment of liability under Article 2240 stops the ten-year clock according to case law the book does not cite; what it does as against the builder's insurer, and the form it must take, are not settled here.
- The role of the adjuster's preliminary report in the decision in principle, which the second spread takes from Annex II to Article A. 243-1, is cited from memory; the current wording of the model clauses is still to be read.