Book No. 5 as text
What a burned workshop is worth
After a fire, how much does the insurer actually pay for a building, once replacement cost, depreciation and the average clause have done their work?
Written for: A claims handler, a public adjuster, a property broker who has to explain to a client why the check does not match the cost of the building.
The case
A textbook case, with numbers chosen to come out clean. On the night of March 14 to 15, 2026, a joinery workshop in the Isère burns to the ground. The adjuster puts the cost of rebuilding new, at the date of the loss, at €1,200,000, and the building's depreciation at 30%. The policy is written on a replacement-cost basis. Depreciation can be recovered up to 25%, and that deferred portion is paid on invoices if the insured rebuilds within two years. The law around this check fits in two articles of the French Insurance Code, L. 121-1 (the indemnity cannot exceed the value of the property at the time of the loss) and L. 121-5 (underinsurance), plus a clause that a published judgment of the Cour de cassation, March 20, 2025 (2nd civil chamber, no. 21-23.812), put back in front of the market, under which a building neither rebuilt nor repaired is paid at its value in use, replacement cost less depreciation, capped at its economic value.
Sources · franchise permise à l'alinéa 2) · article L. 121-5 (règle proportionnelle de capitaux) · n° 14) · n° 21-23.812
Spread 1A check in two installments
Article L. 121-1 of the French Insurance Code sets the ceiling. The indemnity cannot exceed the value of the insured property at the time of the loss. Timing matters. On July 8, 2021 (2nd civil chamber, no. 20-10.575), the Cour de cassation overturned an appeal court that had converted the value of stolen gold coins into euros at the date of its own ruling; value is taken on the day of the loss. For a twenty-year-old building, that value sits well below the cost of rebuilding it. Read alone, the article would pay for a twenty-year-old workshop, which no contractor can build.
Replacement-cost cover gets around the problem without breaking the rule. On March 26, 2015 (2nd civil chamber, no. 14-13.332), the Court held that the indemnity principle does not prevent a clause paying a building on a replacement-cost basis. The French market pays it in two installments. The immediate indemnity is the rebuilding cost less depreciation, which the insured would have received anyway. The top-up, the deferred indemnity, only comes on proof of rebuilding within the policy period, two years in most wordings. If nothing is rebuilt, what has already been paid stays within the indemnity principle and the insurer has nothing to claw back.
In our workshop, €1,200,000 of replacement cost and 30% depreciation give €840,000 paid up front. The clause caps recoverable depreciation at 25%, so the deferred portion is €300,000. The remaining five points, €60,000, stay with the insured whether or not the walls go back up. If the workshop is rebuilt within two years, the total is €1,140,000 before the deductible, which L. 121-1 expressly allows. That 25% cap is an assumption of the example; wordings on the market carry other caps, sometimes none, and it is the first line a public adjuster rereads when the number looks wrong.
Rebuilding smaller also costs part of the deferred payment. If the clause caps it at invoiced works, an assumption of the example, a workshop rebuilt for €1,000,000 brings in only €160,000 of deferred payment, the invoice less the €840,000 already paid. So a public adjuster prices the project before the client signs a contract.
Market term · Deferred indemnity. The share of a replacement-cost settlement that matches recoverable depreciation. It is only paid on proof of rebuilding or repair, within the period set by the policy.
Sources · franchise permise à l'alinéa 2) · n° 20-10.575 (valeur au jour du sinistre) · analyse de jurisprudence) · complément sur justificatifs dans les deux ans)
Spread 2Rebuild, or keep the check
The deferred payment is conditional, and judges read the condition as written. On July 7, 2022 (2nd civil chamber, no. 20-19.264), a chalet insured on a replacement-cost basis could not lawfully be rebuilt on the same spot, though rebuilding elsewhere was possible. The Court accepted that this impossibility could open the right to replacement cost, but the top-up remained subject to the policy's conditions, starting with documents proving the works. The insureds did not produce them. The Revue générale du droit des assurances headed its case note with a line that sums up the market's reading, namely that the parties' contract prevails.
The time limit is argued far more often than the principle. On April 12, 2012 (2nd civil chamber, no. 11-18.113), the Court quashed a ruling that refused the deferred payment because no invoices were produced within two years, without answering the insured, who argued that an administrative constraint prevented an identical rebuild and that a settlement had interrupted the time limit. When a clause is silent on when the clock starts, on whether works must be started or finished, or on whether paid invoices count or only signed contracts, the file becomes a dispute over interpretation. A handler who closes the deferred payment on the day after month twenty-four, without rereading the clause line by line, may see a judge reopen it years later.
If nothing is rebuilt, the yardstick changes. In the judgment of March 20, 2025 (2nd civil chamber, no. 21-23.812, published), the policy at issue provided that a building neither rebuilt nor repaired is paid at its value in use, replacement cost less depreciation, capped at its economic value. That cap bites on old industrial buildings, which cost far more to rebuild than they are worth. In our example, value in use comes to €840,000; if the adjuster puts economic value at €700,000 (an assumption), an insured who sells the bare land receives €700,000 and not a euro more.
The owner then runs a calculation the policy does not run for him. Rebuilding costs €1,200,000 of works and brings in €1,140,000, so €60,000 out of his own pocket for a new workshop. Not rebuilding leaves €700,000 in the bank and a plot to sell, with no workshop. Between the two regimes the gap in indemnity reaches €440,000, and that is the figure he sets against his order book.
Market term · Value in use. Replacement cost less depreciation. Some policies cap it at the building's economic value when the building is neither rebuilt nor repaired.
Sources · RGDA septembre 2022 · inédit (Légifrance) · n° 14) · n° 21-23.812
Spread 3The sum insured on the schedule
In substance, Article L. 121-5 provides that if the estimates show that the value of the insured property on the day of the loss exceeds the sum insured, the insured is treated as their own insurer for the excess and bears a proportional share of the loss, unless otherwise agreed. The French insurance ombudsman, the Médiation de l'assurance, gives the working formula in a case study published in October 2022, which multiplies the amount of damage by the ratio of insured value to actual value. The rule penalizes a sum insured that is too low, with no fault required, and it applies without any argument about bad faith.
In our example, the policy compares the sum insured with the replacement cost at the date of the loss (an assumption; other wordings use another reference). Sum insured, €900,000; value, €1,200,000; ratio, 0.75. If the fire only takes the machine wing, for €400,000 of damage, the insurer pays €300,000. If everything burns, €1,200,000 times 0.75 comes to €900,000, exactly the sum insured, which would have capped the payment anyway. A total loss hides the rule. It shows on partial losses, and that is where it catches out an insured who thought only a quarter of the cover was missing. A sum insured also goes stale without anyone touching it, because the article takes value on the day of the loss and building costs move from one year to the next.
The words "unless otherwise agreed" leave the rule to the parties. Some policies set it aside with a first-loss clause, under which the insurer pays the damage up to the sum insured, with no pro rata. Elsewhere the argument moves to the "estimates" in the article. The reference value is set during the adjustment, with both sides present, and ten points of difference on that value weigh on the check as much as ten points on the sum insured. A public adjuster knows this, and often opens the discussion on how the new building was priced, by the square meter or by a detailed quote.
Market term · Average clause (underinsurance). Reduction of the payment by the ratio of sum insured to the property's value on the day of the loss (article L. 121-5), when the sum insured is lower than that value, unless otherwise agreed.
Sources · article L. 121-5 (règle proportionnelle de capitaux) · règle proportionnelle)
Spread 4The other proportional rule
Article L. 113-9 deals with an omission or inaccurate statement by an insured whose bad faith has not been established. The policy is not voided; if the error comes to light after the loss, the payment is reduced in proportion to the premium rate actually paid over the rate that would have been due had the risk been fully and accurately declared. The comparison is between premium rates; the sum insured plays no part. Proven bad faith falls under another article, L. 113-8, and another sanction, nullity of the policy. In an adjuster's report the two proportional rules carry similar names; the insurer's letter has to say which one it applies, and under which article.
Back to the workshop, this time with the right sum insured and a partial loss of €400,000. Assume the proposal form left out a spray-finishing booth installed in 2024, and that the premium with the booth would have been €8,000 instead of the €6,000 paid. €400,000 times 6,000 over 8,000 comes to €300,000, the figure from the previous spread. The cause has nothing in common. There, a sum insured set too low; here, a risk described wrongly. Nor does the defense. Under L. 121-5, the public adjuster argues about the building's value; under L. 113-9, the adjuster asks the insurer to prove, with documents, the rate it would have charged.
Found before any loss, the same omission is handled differently. The insurer may keep the policy for a premium increase the insured accepts, or cancel it ten days after notice by registered letter, refunding the unearned premium. For the workshop, the same oversight costs €2,000 a year in premium before the fire, €100,000 of indemnity after.
Market term · Proportional premium rule. Reduction of the payment by the ratio of premium paid to premium that would have been due, when an inaccurate declaration made in good faith comes to light after a loss (article L. 113-9).
Sources · article L. 113-9 (règle proportionnelle de prime)
Key points
- The payment cannot exceed the property's value on the day of the loss (article L. 121-1); the Cour de cassation upheld a replacement-cost clause for a building on March 26, 2015 (no. 14-13.332).
- Replacement cost is paid in two installments: depreciation deducted up front, recoverable depreciation on proof of rebuilding within the policy period, often two years.
- A building neither rebuilt nor repaired may, depending on the wording, only be paid at value in use capped at economic value (the clause at issue in the March 20, 2025 judgment, no. 21-23.812).
- The average clause (L. 121-5) compares sum insured with value; the premium rule (L. 113-9) compares premium paid with premium due; both can yield the same figure for different reasons.
Sources
- Code des assurances, article L. 121-1 (principe indemnitaire, franchise permise à l'alinéa 2), 1976 · checked at source
- Code des assurances, article L. 121-5 (règle proportionnelle de capitaux), 1976 · checked at source
- Code des assurances, article L. 113-9 (règle proportionnelle de prime), 1976 · checked at source
- Cass. 2e civ., 26 mars 2015, n° 14-13.332 (ANIL, analyse de jurisprudence), 2015-03-26 · checked at source
- Cass. 2e civ., 12 avril 2012, n° 11-18.113, inédit (Légifrance), 2012-04-12 · checked at source
- Cass. 2e civ., 7 juillet 2022, n° 20-19.264, note Ph. Casson, BJDA n° 83 ; commentaire A. Pimbert, RGDA septembre 2022, 2022-07-07 · checked at source
- Cass. 2e civ., 20 mars 2025, n° 21-23.812, FP-B+R, cassation partielle de CA Nîmes, 2 sept. 2021 (Gazette du Palais 2025, n° 14), 2025-03-20 · checked at source
- Dalloz actualité, Civ. 2e, 20 mars 2025, FP-B+R, n° 21-23.812, 2025-03-20 · checked at source
- La Médiation de l'assurance, étude de cas du 18 octobre 2022 (déclaration du risque, règle proportionnelle), 2022-10-18 · checked at source
- BJDA, article 2019 sur la valeur à neuf et le principe indemnitaire (indemnité immédiate, complément sur justificatifs dans les deux ans), 2019 · checked at source
- Cass. 2e civ., 8 juillet 2021, F-B, n° 20-10.575 (valeur au jour du sinistre), 2021-07-08 · checked at source
What we chose not to write
- No primary source (Légifrance, courdecassation.fr, Dalloz, Lextenso) was read in full. Statutes and judgments are established from consistent search snippets, not from reading them in full.
- For the judgment of March 20, 2025 (no. 21-23.812), the exact ground for the partial quashing (inconsistency over applying the clause on the court's own motion, according to one snippet) could not be confirmed; the book cites only the clause at issue, not the outcome.
- Judgment of April 12, 2012 (no. 11-18.113), read in full on November 11, 2026. The book first summed up the quashing too briefly; it now states the two arguments left unanswered, the administrative constraint and the settlement.
- The Cass. 3rd civil chamber judgment of September 7, 2017, no. 16-15.257 (market value of a burned building that cannot be rebuilt) has been removed. Commentaries link it to full compensation, possibly outside an insurance contract, and one source presents it differently.
- The recoverable depreciation caps "of 25% or 33%" cited by commercial sites have been removed; the book's 25% is set as an assumption of the textbook example.
- The Douai court of appeal judgment (2024, indemnity at a market value of €37,000) has been removed, for want of a second source and a full reference.
- The Cass. 2nd civil chamber judgments of March 13, 2025 (updating of indemnities) and January 19, 2023 (no. 21-17.436) have been removed, their number or outcome not being confirmed.
- The workshop in the Isère, its dates of March 14 to 15, 2026, its amounts, its spray-finishing booth and its economic value of €700,000 make up a textbook example, stated as such in the text.
- The Villeurbanne bakery, the Vosges spinning mill, the cold store near Cavaillon, the Nantes print shop, and the dates and amounts of the step-by-step pages are textbook examples, with no real facts. The clause capping the deferred payment at the cost of invoiced works (spread 1) is an assumption of the example.